Home › Collier Township

Point-of-sale requirement

Collier Township dye test and lateral inspection

Collier Township requires a dye test and a camera inspection of the sewer lateral for every property sale or refinance. Here is what the Township's Sewer Department requires and how to get it done before closing.

What Collier Township requires

Checked November 2026
Required for
All new construction and every exchange of property in Collier Township, including refinancing
What's required
A dye test plus a video camera inspection of the sewer lateral.
Valid for
Dye test: 2 years. Lateral inspection: 5 years.
Municipal fee
$95 application fee, payable to Collier Township Sewer Department
Deadline
Submit the application and fee at least 20 days before closing
Who can test
A plumber licensed in Allegheny County
Sewer Department
412-279-4941

How to register with Collier Township

  1. The owner signs the Application for Sanitary Certification and sends it with the $95 fee to the Sewer Department, in person at 2418 Hilltop Road, Presto, or as a PDF to [email protected]. The Township's online form isn't working right now.
  2. A licensed plumber does the dye test and the camera inspection.
  3. The plumber sends the reports, sketch and photos to [email protected] or [email protected], and the video electronically or on a labeled flash drive.
Test when you list?
Yes. The dye test is good for 2 years and the lateral inspection for 5.
Town contact
Sewer Department 412-279-4941, [email protected]

Collier Township Sanitary Certification application and instructions

What happens during the test

  • The plumber dye tests the sinks, laundry tubs, floor drains, showers and toilets inside the house.
  • Outside, the plumber dye tests roof leaders, stairwell drains and driveway drains to confirm none of them run into the sanitary sewer.
  • The plumber checks for a sump pump and where it discharges, and locates the cleanouts and fresh air vent.
  • A camera goes through the sewer lateral. The color video must be clear and well lit, and it goes to the Sewer Department with the report.

If the test fails

If the test fails, the Township requires the entire lateral to be replaced or relined to the Allegheny County Plumbing Code. One spot repair is allowed only if the lateral is all PVC or ABS pipe with no other structural defects. A repair plan is filed with the Allegheny County Health Department Plumbing Division, and a Sewer Department representative must inspect the work before the certificate is issued. Call the Sewer Department at 412-279-4941.

Request a test or a repair quote

Summarized from the municipality's published rules, last checked November 2026. We check them on the first of every month. Rules change, so confirm with your town before closing.

Rules for other towns